Construction cleaning is not a single clean but several, following the phases of the building project. The usual approach is three steps: rough cleaning, final cleaning and pre-inspection cleaning. Each step has its own purpose and timing. Below you will see what each step includes and how the cleaning is planned ahead of the inspection.
Rough cleaning is done continuously during the project and when the heavy work is finished. The aim is to keep the site safe and accessible and to remove the worst before surfaces and fittings are installed.
Final cleaning is done when surfaces, joinery and installations are in place. Now all construction dust must be removed from every surface, because dust left behind spreads once the ventilation is started.
Pre-inspection cleaning is done just before the final inspection and handover to the client. It checks that no surfaces have been missed and removes dust that has settled after the final cleaning. The result should match what was agreed, so that the cleaning does not become a remark at the inspection.
Construction cleaning is aimed at construction companies, contractors and property owners with building projects. If you are a private person who has renovated your home and need the construction dust removed, post-renovation cleaning is what you are looking for. If only the worst needs removing first, rough cleaning may be the right choice.
Read more about construction cleaning in Malmö.
For private customers, see post-renovation cleaning.
Also read about rough cleaning.